Hi, I've done a bit of reading up on migrating SBS2003 to SBS2008, however the situation i find myself in is a little different. Basically, two companies which both have SBS2003 are looking to merge, with a single SBS2008 at the new premises. Is such a migration possible and even worth considering? I'm assuming one SBS2003 server would be migrated